Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the interactive-geo-maps domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114
Projects – Horizon Engineering Services

Projects

Our Milestones

We have a lot of projects in many engineering fields whether they are design or supervision of construction.

Lifeboat Platform

Analysis & Design of 80-Man Lifeboat Platform onboard semi-submersible rig.

New Pipe Deck

Stiffening of existing deck & Design of new pipe deck onboard semi-submersible rig.

emergency supporting system

Analysis & Design of emergency supporting system to support/access 155 MT. LMRP unit.

Multi-storey working platform

Analysis & Design of 3-storey working platform with sliding panels to access the BOP onboard a drillship.

Al-Andalus factory

Al-Andalus factory for marble & granite

BOP Lifting Clamp

Analysis & Design of 13’‐5/8” BOP Lifting Clamp.

subsea lifting basket

Analysis & Design of subsea lifting basket to carry 12 transponders including storage area inside.

Skylight & Walkway

Skylight and walkway in Fazaa HQs, Doha, Qatar

X-mas tree foundation

Analysis & Design of foundation for 113 MT X-mas tree on  semi-submersible rig.

removable storage area

Analysis & Design of removable storage area consists of 64 separate segments (Lego Deck) onboard semi-submersible rig.

drawworks drum shaft

Analysis & Design of lifting frame for drawworks drum shaft onboard semi-submersible rig.

subsea lifting basket

Analysis & Design of lifting frame for existing Stabbing Basket.

Stabbing Basket lifting frame

Analysis & Design of lifting frame for existing Stabbing Basket.

X-mas tree foundation

Analysis & Design of foundation to accommodate 69 MT X‐mas tree on Drillship.

Lifting Frame

Analysis & Design of Lifting Frame for two Transfer Pumps at Pipe Rack onboard semi-submersible rig.

link bridges

Composite link bridges in Doha Mall, Qatar

We Provide the Best Service in Industry​

We have wide engineering experience so we can help you with any consultancy